ISE 5330 - Cost Engineering Instruction in product cost estimating, product value engineering, and manufacturing performance evaluation in state-of-the-art manufacturing systems. Examines the application of industrial engineering techniques, work measurement, cost accounting, and computers to manufacturing cost measurement and process design.
Requisites: Credit Hours: 2 Repeat/Retake Information: May not be retaken. Lecture/Lab Hours: 2.0 lecture Grades: Eligible Grades: A-F,WP,WF,WN,FN,AU,I Learning Outcomes: - Apply activity based costing (ABC) to determine the actual cost of a product.
- Develop a cost estimate for a project.
- Develop a parametric cost estimation relationship.
- Evaluate risk for a project cost estimate.
- Explain the difference between parametric and bottoms up cost estimation.