|
Jul 04, 2024
|
|
|
|
ISE 4345 - Network Analysis Engineering project planning using such techniques as PERT and critical path method, resource allocation in project networks, shortest path models, spanning-tree problems, traveling salesman problems, maximum-flow problems, and other stochastic network models, such as GERT.
Requisites: ISE 4140 Credit Hours: 2 Repeat/Retake Information: May be retaken two times excluding withdrawals, but only last course taken counts. Lecture/Lab Hours: 2.0 lecture Grades: Eligible Grades: A-F,WP,WF,WN,FN,AU,I Learning Outcomes: - Students will be able to formulate and solve minimum spanning-tree problems.
- Students will be able to use Maximum-Flow Problems.
- Students will be able to use Resource Allocation in Project Networks.
- Students will be able to use Shortest Path Models.
Add to Portfolio (opens a new window)
|
|